page_banner

Products

18 Years Factory 20 Inch Carbon Steel Pipe - Low Temperature Pipe (A333 A334 Gr.6 Gr.3) – Sinoworld

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We generally continually give you quite possibly the most conscientious shopper company, and the widest variety of designs and styles with finest materials. These endeavours include the availability of customized designs with speed and dispatch for Emt Conduit Flange, Perforated Stainless Steel Pipe, Stainless Mandrel Bends, Any needs from you'll be paid out with our best notice!
18 Years Factory 20 Inch Carbon Steel Pipe - Low Temperature Pipe (A333 A334 Gr.6 Gr.3) – Sinoworld Detail:

Mainly Grade

Grade 1, Grade 3, Grade 4, Grade 6, Grade 7, Grade 8, Grade 9, Grade 10, Grade 11;
Low temperature carbon steel pipe quenching temperature in A3 + (30 ~ 50) ℃, in practice, is usually set to the upper limit. High quenching temperature heat pipe can make low speed, surface oxidation reduction, and can improve work efficiency. The workpiece is uniform austenite, will require sufficient holding time. If the actual installed furnace capacity, would need to be appropriate to extend the holding time. Otherwise, there may be insufficient hardness due to uneven heating caused by the phenomenon. However, the holding time is too long, will also appear coarse grains, oxidation and decarbonization serious ills affecting quenching quality. We believe that if installed furnace is greater than the process documents, heating holding time to be extended 1/5.

Low temperature carbon steel pipe because of low hardenability, it should adopt a large cooling rate of 10% salt solution. Workpiece into the water, should hardenability, but not chilled, if 45 # precision steel chilled in brine, it is possible cracking of the workpiece, this is because when the workpiece is cooled to about 180 ℃, the austenite rapidly converted to horse s body tissue caused by excessive stress due. Therefore, when the quenching and tempering steel quickly cooled to this temperature range, the approach should be taken to slow cooling.

As the water temperature is difficult to grasp, accountable experience in operation, when the water stops dithering artifacts, you can water cooled (eg oil cooler can be better). In addition, the workpiece into the water, appropriate action should still be in accordance with the geometry of the workpiece, as regular exercise. Stationary cooling medium plus stationary workpiece, resulting in uneven hardness, stress uneven leaving large deformation of the workpiece, and even cracking.


Product detail pictures:

18 Years Factory 20 Inch Carbon Steel Pipe - Low Temperature Pipe (A333 A334 Gr.6 Gr.3) – Sinoworld detail pictures


Related Product Guide:

We have a professional, efficiency team to provide quality service for our customer. We always follow the tenet of customer-oriented, details-focused for 18 Years Factory 20 Inch Carbon Steel Pipe - Low Temperature Pipe (A333 A334 Gr.6 Gr.3) – Sinoworld , The product will supply to all over the world, such as: Lebanon, Bahrain, Costa rica, We only supply quality products and we believe this is the only way to keep business continue. We can supply custom service too such as Logo, custom size, or custom products etc that can according to customer's requirement.
  • The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Adam from Manchester - 2018.06.05 13:10
    We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Roberta from Zambia - 2018.02.08 16:45
    Write your message here and send it to us